apple.gif (24166 bytes)

The UVM Apple Team

Dr. Lorraine Berkett, Dr. Elena Garcia,  Terence Bradshaw, Jessica Reardon, Linda Boccuzzo, and Karl Zahn

uvmlogogreenwhite.gif (6745 bytes)

The UVM Apple Program:

Extension and Research for the commercial tree fruit grower in Vermont and beyond...

imageextapple.gif (4123 bytes)

Vermont Apple IPM Focus

  L.P.Berkett, IPM Specialist


2000 DD Accumulation for

Apple Scab Ascospore Maturity

2000  Estimated Degree-Day Accumulation (Base 32F, from McIntosh Green Tip) for Selected Sites

Date

UVM Hort.Res.Center (GT= 04/08)

Shoreham (GT= 04/15)

New Haven (GT= 04/08)

Bennington (GT= 04/05)

Saxtons River (GT=04/11)

Franklin (GT= 5/2)

04/16 82 45 45 111 60 Not Avail
04/19 112 75 75 140 90 Not Avail
04/23 159 126 166 186 134 Not Avail
04/25 175 144 182 205 150 Not Avail
04/29 222 190 227 240 182 Not Avail
05/02 267 236 271 282 222 14
05/03 282 251 286 297 236 28
05/07 410 383 415 422 354 143
05/09 476 457 486 503 430 203
05/13 569 555 576 598 517 288
05/15 609 593 617 633 552 328
05/17 647 632 655 670 589 366
05/21 721 707 728 742 661 437
05/25 826 811 832 835 751 539
05/28 898 885 906 903 823 606
05/30 946 934 955 946 866 652
06/04 1097 1088 1107 1091 1011 794
06/07 1159 1152 1170 1151 1070 853

Please use the following chart to Estimate Ascospore Maturity

Cumulative Percentage of Ascospores Matured at Various Degree Day Accumulations (Base=32 F)1

Cumulative

90%

Degree Days2

Ascospores

Confidence Interval

Matured (%)

for Estimate3

35

1

0-7

110

3

0-14

145

5

1-19

215

12

2-32

325

25

7-55

450

50

21-80

575

75

46-94

685

90

69-98

740

95

79-99

790

97

86-100

865

99

93-100

1-Table from "Pest Management Recommendations for Commercial

Tree-Fruit Production, 1999", Cornell Cooperative Extension Publication.

2- DD should be recorded from the date when 50% McIntosh fruit buds

are between silver tip and green tip. The base temperature = 32F.

Data of Gadoury and MacHardy, 1982.

3-The width of the 90% confidence interval is a statistical measure of the

precision of estimated maturity. It is the range within which the estimate

should fall 90% of the time.


Please send comments and suggestions tolorraine.berkett@uvm.edu

Back to Vermont Apple IPM Focus home page

visitors since 04/03/00